3 Beds
3 Baths
1,188 SqFt
3 Beds
3 Baths
1,188 SqFt
Key Details
Property Type Manufactured Home
Sub Type Manufactured Home
Listing Status Pending
Purchase Type For Sale
Square Footage 1,188 sqft
Price per Sqft $265
Subdivision Not On List
MLS Listing ID 843499
Style Contemporary,Detached,Mobile Home,One Story
Bedrooms 3
Full Baths 3
HOA Y/N No
Year Built 2001
Annual Tax Amount $715
Tax Year 2024
Lot Size 0.530 Acres
Acres 0.53
Property Sub-Type Manufactured Home
Property Description
Location
State FL
County Pasco
Area 30
Zoning AR
Interior
Interior Features Bathtub, Eat-in Kitchen, Garden Tub/Roman Tub, Main Level Primary, Primary Suite, Open Floorplan, Pantry, Stone Counters, Split Bedrooms, Separate Shower, Tub Shower, Walk-In Closet(s), Wood Cabinets, Window Treatments, First Floor Entry
Heating Central, Electric, Heat Pump
Cooling Central Air, Electric
Flooring Carpet, Tile, Vinyl
Fireplace No
Appliance Dishwasher, Electric Oven, Electric Range, Microwave, Refrigerator
Exterior
Exterior Feature Awning(s), Deck, Landscaping, Lighting, Rain Gutters, Paved Driveway, Unpaved Driveway
Parking Features Detached Carport, Driveway, Detached, Garage, Paved, Unpaved, Carport
Garage Spaces 4.0
Garage Description 4.0
Fence Chain Link, Wood, Yard Fenced
Pool None
Water Access Desc Well
Roof Type Asphalt,Shingle
Porch Deck, Wood
Total Parking Spaces 6
Building
Lot Description Cleared, Flat, Multiple lots, Rectangular, Trees
Faces Southeast
Entry Level One
Foundation Crawlspace
Sewer Septic Tank
Water Well
Architectural Style Contemporary, Detached, Mobile Home, One Story
Level or Stories One
Additional Building Barn(s), Garage(s), Shed(s), Storage, Workshop
New Construction No
Schools
Elementary Schools Other
Middle Schools Other
High Schools Other
Others
Tax ID 00012511
Security Features Smoke Detector(s)
Acceptable Financing Cash, Conventional, FHA, VA Loan
Listing Terms Cash, Conventional, FHA, VA Loan
Special Listing Condition Standard, Listed As-Is
Virtual Tour https://tours.expertlyphotographed.com/2289455?idx=1
“Our experience with Josh's team was excellent. Their professionalism speaks for itself. From the first day we met Josh we knew we were dealing with a professional and knowledgeable person. And this professionalism was evident in the rest of his team, whom we had the pleasure of meeting...”
"Josh makes it easy, and his international network consists of the top agents throughout the world. If you have anything that you need handled regarding "real estate" - Josh should be your first call."